Timmins Tequila Mine Drill Results
posted on
Dec 16, 2008 04:35AM
Targeting 2013 annual production of 118,000 ounces of gold
Timmins Gold Intersects 11.64 g/t Gold Across 2 Meters, 6.17 g/t Gold Across 3 Meters, and 4.43 g/t Gold Across 4 Meters in Separate Drill Holes at Tequila Project
Tuesday December 16, 8:30 am ET
Summary of Significant Assay Results for the 2008 Drilling Program Tequila Project -------------------------------------------------------------------------- -------------------------------------------------------------------------- Drill Hole Drill Cross- Mineralization Assay Hole Section Interval (m) Results Comments ------------------------------------ Core Au Ag From To Length (g/t) (g/t) -------------------------------------------------------------------------- -------------------------------------------------------------------------- Veta Grande BD-1 S-2 23.00 40.00 17.00 1.234 7.6 vein system ----------------------------------------------- includes 23.00 31.00 8.00 1.764 10.1 ----------------------------------------------- includes 27.00 29.00 2.00 4.370 27.0 ----------------------------------------------- and 94.50 126.80 32.30 4.834 29.0 -------------------------------------------------------------------- Veta Grande vein includes 94.50 98.50 4.00 5.660 39.4 system Ore-shoot 1 -------------------------------------------------------------------- includes 96.50 98.50 2.00 10.670 69.0 -------------------------------------------------------------------- Veta Grande vein 103.50 109.05 5.55 15.143 8.1 system Ore shoot 2 ----------------------------------------------- or 107.50 109.05 1.55 40.400 229.1 -------------------------------------------------------------------- 109.05 111.80 2.75 No Core (existing adit) -------------------------------------------------------------------- 113.80 118.80 5.00 6.490 40.9 -------------------------------------------------------------------------- -------------------------------------------------------------------------- Veta Grande BD-2 S-2 21.00 43.00 22.00 1.579 6.3 vein system ----------------------------------------------- includes 22.00 23.20 1.20 2.400 - -------------------------------------------------------------------- Ore-shoot 1 includes 31.00 44.00 13.00 2.361 - Veta Grande vein ----------------------------------------------- includes 34.00 36.00 2.00 3.390 - ----------------------------------------------- includes 40.00 41.00 1.00 3.430 - ----------------------------------------------- and 49.00 50.00 1.00 0.694 8.1 -------------------------------------------------------------------------- -------------------------------------------------------------------------- BD-6 30.50 31.50 1.00 0.926 0.7 This hole was and 136.00 137.50 1.50 5.640 11.1 focused on exploring the continuity of the high grade gold in the existing underground workings of the Guadalupe vein. Hole BD-06 intersected two intervals that could correspond to the projection at depth of this mineral structure -------------------------------------------------------------------------- -------------------------------------------------------------------------- Veta Grande BD-7 S-2 22.00 45.35 23.35 1.820 9.1 vein system ----------------------------------------------- includes 25.25 28.35 3.10 3.074 N/A ----------------------------------------------- includes 43.35 45.35 2.00 11.642 N/A -------------------------------------------------------------------------- -------------------------------------------------------------------------- Mineralization within the Veta BD-9 S-6 22.00 23.00 1.00 0.890 0.5 Grande vein system ----------------------------------------------- and 37.00 38.00 1.00 2.370 20.6 ----------------------------------------------- and 75.00 78.00 3.00 6.176 31.8 ----------------------------------------------- and 104.50 110.50 6.00 1.430 25.3 -------------------------------------------------------------------------- -------------------------------------------------------------------------- Mineralized intersections within the projection of the mineral BD-18 S-3 27.00 30.00 3.00 0.631 1.0 trend to the SW ----------------------------------------------- and 48.00 56.00 8.00 0.511 1.5 ----------------------------------------------- and 85.00 86.00 1.00 0.738 5.6 ----------------------------------------------- and 96.00 100.00 4.00 4.430 48.1 -------------------------------------------------------------------------- --------------------------------------------------------------------------
|
Drilling to date has tested only 1/3 of the known strike length of the mineralized system. Of the 18 holes completed, 14 returned economic gold grades over appreciable widths. Five of the holes confirmed the continuity of the Veta Grande Vein over 350 meters of strike length. The Company is currently reviewing the data from the drill program to assess future exploration activity.
Qualified Person
Pursuant to National Instrument 43-101, Darcy Krohman, P.Geo., C.A,. Executive Vice-President and CFO of Timmins Gold Corp. is the Qualified Person (QP) responsible for the disclosure in this news release. Field work has been conducted by Timmins Gold Corp. employees and contractors.
We seek Safe Harbor.
This News Release contains forward-looking statements. Forward-looking statements are statements which relate to future events. In some cases, you can identify forward-looking statements by terminology such as "may", "should", "expects", "plans, "anticipates", believes", "estimates", "predicts", "potential", or "continue" or the negative of these terms or other comparable terminology. These statements are only predictions and involve known and unknown risks, uncertainties and other factors that may cause our or our industry's actual results, level of activity, performance or achievements to be materially different from any future results, levels of activity, performance, or achievements expressed or implied by these forward-looking statements.
While these forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect out current judgment regarding the direction of our business, actual results will almost always vary, sometimes materially, from any estimates, predictions, projections, assumptions or other future performance suggestions herein. Except as required by applicable law, Timmins Gold does not intend to update any forward-looking statements to conform these statements to actual results.
The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.
Contact:
Contacts: Timmins Gold Corp. Bruce Bragagnolo, LLB CEO (604) 638-8980 Email: bruce@timminsgold.com Timmins Gold Corp. Darcy Krohman, P.Geo., C.A. Executive Vice-President & CFO (604) 638-8971 Email: darcy@timminsgold.com Timmins Gold Corp. - Investor Relations Leighton Bocking Corporate Development (604) 638-8977 Email: leighton@timminsgold.com Timmins Gold Corp. - Investor Relations Alex Tsakumis, BA Corporate Development (604) 638-8976 Email: alex@timminsgold.com Website: http://www.timminsgold.com
Source: Timmins Gold Corp.