I like this part even better:
"In the PEA, ERCOSPLAN recommends additional flotation testwork and an additional solution cavern to produce brine for further evaporation testwork, to facilitate a Feasibility Study evaluating the potential to concurrently extract both MOP and SOP from the same brine field."
Allana MOP and SOP has potential synergies permitting a CAPEX and OPEX reduction. I don't know enough of the detailed minutae to guess how much of a reduction this could be, but I cannot imagine it's trivial.
On paper, this is literally the most promising potash project on the planet by miles as far as I can see. Too bad the potash industry itself stinks.