Welcome To The Alto Ventures HUB On AGORACOM

Alto Ventures Ltd.: Alto-Wescan Finalize Drill Contract for Mud Lake Project, Beardmore-Geraldton Gold Belt

Free
Message: Alto Intersects High Grade Gold

Alto Intersects High Grade Gold

posted on Mar 25, 2008 05:10AM
Alto Intersects High Grade Gold at Despinassy, Quebec
Symbol: ATV

VANCOUVER, BRITISH COLUMBIA--(Marketwire - March 25, 2008) - Alto Ventures Ltd. (TSX VENTURE:ATV) is pleased to announce results from the first four diamond drill holes completed on its 100% owned Despinassy Project located 75 km north of Val d'Or, Quebec. Gold was intersected in each drill hole including high grade of 20.6 grams per tonne (g/t) gold across 0.8 m within a wider mineralized section averaging 7.0 g/t gold across 2.5 m.

The four holes reported are from the area of the Darla Zone where previous drilling intersected 19.5 g/t gold across 2.1 m. The Darla Zone is one of several high priority gold prospects which were identified along a six kilometre segment of the Despinassy Shear Zone (\"DSZ\"), a zone of intense deformation and alteration that is up to 200 m wide and locally hosts significant gold mineralization. The DSZ has many geological and structural characteristics which are similar to the geological settings that host gold deposits in the Timmins gold camp. Other significant prospects along the DSZ include the DAC Deposit and Area 3.

To date, the best known prospect along the DSZ is the DAC Deposit where resources of 167,000 tonnes grading 6.88 g/t gold in the Indicated plus 445,000 tonnes grading 4.46 g/t gold in the Inferred categories were estimated in compliance with NI43-101 standards (see Alto news release dated November 27, 2006). The deposit is open to expansion at depth and along strike to the west. The Darla Zone is located one kilometre east of the DAC Deposit.

The objectives of this drill program are to (1) further test the DSZ at shallow depths at the Darla Zone and in Area 3; (2) confirm the size and extent of the alteration envelopes; and (3) gauge the strength of the quartz-vein gold systems at these locations. Previous drilling in Area 3 intersected Zone 20 which assays 4.6 g/t gold across 2.0 m and Zone 21 with assays of 2.4 g/t gold across 6.0 m. Area 3 is located two kilometres east of the Darla Zone along the DSZ and is currently being drilled. Results will be reported as they become available.

The current phase of the 2008 program anticipates the completion of 15 to 17 diamond drill holes prior to the spring thaw in early April. Another phase of drilling may be carried out during the second half of 2008.

Table of Significant Assay Results from Holes DES08-103 to DES08-106 --------------------------------------------------------------------------                From        To     Width        Au Hole             (m)       (m)    (m)(i)     (g/t)   Comments -------------------------------------------------------------------------- DES08-103      54.4      58.6       4.2      0.55  includes      55.5      56.6       1.2      1.07                120.0     130.1      10.1      0.53  includes     129.0     121.0       1.0      2.82  and          129.0     130.1       1.1      1.45 -------------------------------------------------------------------------- DES08-104     104.5     107.0       2.5      7.02  includes     105.2     106.0       0.8     20.63    2 grains of visible                                                       gold observed               114.5     136.7      22.2      0.35  includes     119.0     120.0       1.0      1.24                168.5     169.5       1.0       2.3    4 grains of very fine                                                      visible gold observed -------------------------------------------------------------------------- DES08-105     203.0     204.0       1.0       1.3 -------------------------------------------------------------------------- DES08-106     116.4     124.6       8.2      1.19  includes     117.1     117.9       0.8      2.35  and          123.2     124.6       1.4      3.82                146.4     147.4       1.0      1.39 -------------------------------------------------------------------------- (i) Mineralized intervals reported are down-hole lengths as there is      insufficient drill-hole density to estimate true widths.  


Mike Koziol, P. Geo., P.Eng. and Alto's President and CEO is the Qualified Person who has reviewed and approved this news release.
Share
New Message
Please login to post a reply