Welcome To The Bralorne Gold Mines HUB On AGORACOM

Edit this title from the Fast Facts Section

Free
Message: Moves Forward With New Adit for BK Zone

Moves Forward With New Adit for BK Zone

posted on Apr 09, 2009 06:27AM
April 9, 2009
Bralorne Moves Forward With New Adit for BK Zone
VANCOUVER, BRITISH COLUMBIA--(Marketwire - April 9, 2009) - Bralorne Gold Mines Ltd. (the "Company") (TSX VENTURE:BPM)(PINK SHEETS:BPMSF)(BERLIN:GV7)(FRANKFURT:... A0B75M) is pleased to announce we have mobilized our equipment and a skilled team of miners to begin the construction of the new adit on the Lorne block. This new adit will act as an access ramp to the BK vein at the 575 level. The company previously drifted 500 meters on the BK vein at the 800 level encountering mineralized zones of 40.87 meters of 28.8 g/t of Au with a width of 1.66 meters and 24.70 meters of 17.98 g/t of Au with a width of 1.22 meters. This new access will allow us to further develop the gold resources in the BK zone and to elevate the resource category.

(See news release November 25, 2008)

The Bralorne mine is located 150 air miles from Vancouver, BC. The Company is fully permitted and developing the significant gaps between the former and very successful Bralorne, Pioneer and King gold mines. From 1928 to 1971, these three operations produced 4.15 million ounces of gold from 7.9 million tons of ore (equaling a grade of 16.48 grams per tonne). The Bralorne, Pioneer and King mines represent the largest historic gold producers in the Canadian Cordillera. The Company remains well funded with no long-term or short-term debt.

ON BEHALF OF THE BOARD

William Kocken, President
Share
New Message
Please login to post a reply