Jaguar to be spudded very close to the Abary 1 well, and we know there was oil there, just how much is the question, a lot of work and money has been invested in spudding Jaguar at the right location and Tullow seem to be masters at getting it right.
Abary 1 – A Very Significant Well
• Drilled 1975 (Shell)
• Oil and gas shows starting
at 2978m
• Flowed 3360 barrels of fluid per
day at 3990m (TD) during
drilling
• Sampled 37o API crude
from mud
• Well prognosis was to drill
to 4600m (was abandoned due
to mechanical difficulties with
overpressure)
• Excellent seal rocks/
Geopressured
• On flank of ‘Abary Deep’
closure