I just posted the new pictures from today's slide show on the PHOTO Tab on the left highlighed in Pink, and looking at the two drilling rigs that are currently drilling the well pads at Algar got me thinking. I wonder if the Algar well pairs are going to be drilled longer than the majority of the well pairs that were originally drilled at the Great Divide. If you recall the last two well pairs (11 & 12 on the latest presentation) were drilled about 25% longer than the other original 15 well pairs at the Great Divide. So the question is will all of the 17 well pairs being drilled at Algar be the length of the 11 & 12 well pairs at the Great Divide, or will they be drilled even longer?
Best Wishes; Scott