During tomorrows conference call 2 questions need to be asked of management (Pete Sametz) if you are able to get through with your call during the question period if they are not asked by the analysts.
1) Was damage done to the reservoir when production was cut back to producing 4,500 bbl of bitumen per day in December 2008/January 2009? If so is this damage permanent? This has been alleged by several honourable members on this bulletin board.
2) Realizing that the production numbers from each well fluctuate at any given time and daily in total, what is the most recent total production number that you have from the Great Divide in terms of total barrels per day of bitumen production?
These are the two most important questions that need to be asked which were avoided in the Q-3 Report. Could someone please put these two questions to Pete Sametz and lets see what his response is.
Best Wishes; Scott