You look at what Teck says about Schaft Creek on their website:
Schaft Creek (Copper Fox) 1BT @0.46% CuEq*; FS
Now this was before the new holes.....
Look at our 3 cross sections of the Paramount..and thi sis just 1 zone. Will Teck dare let CUU come out with a revised RE while the clock is tocking...I hope so.
http://www.copperfoxmetals.com/s/Image.asp?i=maps/Interpreted-Cross-Section-6360650mN-November-2011.JPG&id=491789
http://www.copperfoxmetals.com/s/Image.asp?i=maps/Interpreted-Cross-Section-6360800mN-Nov2011.jpg&id=491224
http://www.copperfoxmetals.com/s/Image.asp?i=maps/Interpreted-Cross-Section-6361000mN-Nov2011.jpg&id=491223
So we have 0.70%, 0.89%, 0.78%, 0.91%, 0.73%, 1.18%, 0.94%, 0.77% etc.....Pretty far from the 0.46%.
And 13 holes still pending......New zones to be shown, 1 drill still turning......
This is only getting bigger and better.
Add these new rsults to the new economics of the BFS coming:
COMPLETE FEASIBILITY STUDY BY 4TH QUARTER 2011 OBJECTIVE IS TO IMPROVE THE DEPOSIT ECONOMICS: DEFINE A 3 YEAR HIGH-GRADE STARTER PIT, INCREASE THE DAILY MILL CAPACITY, REDUCE THE CAPITAL COSTS AND REDUCE THE PAY-BACK PERIOD
http://www.copperfoxmetals.com/i/pdf/CUU-PP-Nov-2011.pdf