Message: Re: Next round of drill results

Nov 22, 2011 09:57AM

I understand that the labs are the bottleneck dsikorsk but that doesn't change the fact that things are delayed. Let's say the assays from the results we got last week were submitted August 1st (the dates aren't accurate, just for example). The two drills then move onto their next targets and start drilling. Again, just for example's sake, lets say they drill for two weeks to get the core assuming 30 metres per day (not sure if that is accurate but I seem to recall this drill rate from an old post). After the drilling is done, they send the results to the lab on August 15.

Assuming the labs are still similarly backed up, shouldn't we expect that it will take 2 weeks until we get the next set of assay results?

4
Nov 22, 2011 01:07PM