New or updated doc on Sedar. Some tidbits on the 2011 drilling. As can be expected there are a few duds. I'm looking forward to DH 422, 423 & 424. Fingers crossed.
pg 26 & 27
http://sedar.com/GetFile.do?lang=EN&docClass=1&issuerNo=00020511&fileName=/csfsprod/data125/filings/01809549/00000002/C%3A%5CFilings%5CPMR%5CCopperFox%5C2011VoluntaryAIF%5CAmended2011AIF_CUU.pdf
The 2011 diamond drilling program concentrated primarily in the Paramount zone. Twenty two holes totalling 9,649.3 m were drilled and all but seven were in the Paramount zone. A list to the 2011 drill holes completed and the purpose of each hole is set out in the table below [table not copied see NR*]. Three holes drilled into the Paramount zone failed to reach their target depths due to challenging ground conditions and had to be abandoned and re-started in the same location. [I think we know about these 410A...]
One hole was drilled beyond the south end of the deposit but failed to provide adequate geological support to explain the target chargeability anomaly. One hole was drilled to the west of the Liard deposit to test a previouslyreported mineralized interval and a coincident chargeability anomaly identified by the Titan-24 survey completed in2011. One hole was drilled approximately 1.5 kms north of the Paramount zone.
The analytical results for drill holes CF407-2011 to CF412B-2011 have been reported. Analytical results for the balance of the holes completed at Schaft Creek in 2011 will be reported on receipt thereof.
*DH NR: http://www.copperfoxmetals.com/s/NewsReleases.asp?ReportID=490697&_Type=News-Releases&_Title=Drilling-Intersects-0.91-Copper-Equivalent-over-387M-at-Schaft-Creek