Thanks to the person that inboxed me an response... I didn't think to check old NR's. I was wondering if Capex costs were included but it looks like only operating costs.
http://www.copperfoxmetals.com/s/NewsReleases.asp?ReportID=319027&_Type=News-Releases&_Title=Copper-Fox-Metals-Announces-Positive-Results-of-Preliminary-Feasibility-Stu
"...The revenue generated by all the by-products covers all operating costs and adds a credit of (US) $0.32 /lb of copper produced to the revenue stream. Thus, a negative operating cost for copper is estimated;..."\
"....Cash Operating Costs
Cash Operating Costs are estimated at US$12.49 per tonne of ore for the life of the mine. Average costs are US$4.14/t for mining, US$3.94/t for milling, US$0.93/t for general and administration, and US$3.49/t concentrate handling and treatment.
The revenue generated by the production of molybdenum, gold and silver (US$14.36/t) leaves a positive balance of US1.87 $/t. This translates into an additional credit to the copper production of US$0.32 /lb of copper produced."...
I hope to get my own estimate of cu production costs for the 2012 RE in the next couple of days.
GLTA.