The closure of the camp is related to the scheduled drilling program is now complete, winterizing the camp, etc as they do each year.
They usually drill up to Dec 15 and the drilling program was planned for 10,000m thats like15 drill holes.
- Diamond drilling of three (Mike, ES and GK zones) untested Titan-24 chargeability anomalies outlined in 2011,
- Diamond drilling to follow-up the copper-gold-molybdenum-silver mineralization intersected in diamond drill hole 2011CF422 (the Discovery zone) located approximately 1,200m north of the Schaft Creek deposit, and
- Diamond drilling will be conducted in two phases, phase one consists of 5,000m of drilling to test the targets outlined in item d) above. Phase two will consist of at least 5,000m to follow-up zones of mineralization intersected during phase one drilling.