I was told that the schedulred drill program is now complete.
Yep, mid august lol.
They have everything they need. And I was told feasibility is 100% on time. My countdown is reduced to 29 days tomorrow...
I guess the 2 drill holes in the discovery zone was more than enough proof for Teck..(ok guys stop please stop)
Diamond drill hole (DDH) 2012CF426 with a core length of 788.1m intersected visible chalcopyrite mineralization over approximately 90% of its core length along with three intervals of molybdenite mineralization. The drill hole bottomed in weak chalcopyrite-molybdenite mineralization,
And they must have said enough is enough....+ the magnetics, the Titan + the mineralisation on outcrop + ASTER (new north zone and south zone) + the Mira....
Maybe Teck listened to what Elmer said at the AGM:
''If I was Teck, I'd takle it all''