Re: Question?
in response to
by
posted on
Sep 26, 2012 08:36PM
CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)
They would need more than 2 drill rigs the original drill plan was for 10,000m thats about 15 drill holes.
Diamond drilling will be conducted in two phases, phase one consists of 5,000m of drilling to test the targets outlined in item d) above. Phase two will consist of at least 5,000m to follow-up zones of mineralization intersected during phase one drilling.