CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)

Free
Message: Re: How long can they delay?
13
Dec 05, 2012 11:17PM
8
Dec 05, 2012 11:33PM
3
Dec 06, 2012 12:18AM
9
Dec 06, 2012 12:20AM
2
Dec 06, 2012 12:47AM
1
Dec 06, 2012 01:14AM
8
Dec 06, 2012 01:21AM
2
Dec 06, 2012 01:37AM
1
Dec 06, 2012 01:56AM

Dec 06, 2012 07:54AM
5
Dec 06, 2012 08:34AM
4
Dec 06, 2012 09:24AM

Dec 06, 2012 09:48AM

No, the NTL was always part of the plan. Without it there would never be a mine.

"While generation of power on-site is a consideration, it is felt that it would have serious implications to the financial viability of the project. Therefore at this point in the project development, it is assumed that power will be supplied from the BC Hydro grid."