Hope Vette and a few others are correct and the NR will be Tuesday or Thursday.
Based on Liddy's comment this week, it all boils down to Elmer getting those 6 engineers to sign off. This isn't in his hands anymore.
Insiders have been blacked for over a month, The Feasibility is done, The reviews are done, The NR is written.
Next week should be the week, but I keep my expectations realistic,the following week is Christmas eve and the TSX is closed 2 days. One must consider the possibility that Elmer can't get all 6 signatures in time.
Each TT engineer is responsible for his own section and considered QP. Will they get pushed or rushed, are they even all in town ?
If Elmer can't get the signatures in time, the impatient will have to wait just a couple more days, and survive through the holidays.
TSX is closed Tuesday 25th, Wednedsay 26th and Wednesday Jan 2nd.
On the bright side I'll be loading up my various TFSA.
But then again there is the a chance everything works out. TT should feel responsible and make the extra effort. As for the engineers, they will surely want this off their plate by the holidays since no-one wants to go back to work uner immediate pressure to perform.
From Liddy this week:
Six engineers are still looking things over. CUU WILL RELEASE NR as soon as engineers sign off on the feasibility study.