CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)

Free
Message: Re: Negative Cost of Copper
1
Dec 26, 2012 08:29AM
8
Dec 26, 2012 03:23PM
12
Dec 26, 2012 04:26PM
3
Dec 26, 2012 04:39PM
1
Dec 26, 2012 04:44PM

The PFS had an after recovery ore value of $32.67 per tonne using the feasibility base case prices. The PFS had a cost of $12.46 per tonne to mine and process that ore. Therefore, the operating profit was $20.21 per tonne.

If you apply the lower grades from the BFS, the ore value drops to $29.50 per tonne. Then applying the lower recoveries further reduces the ore value to $27.74 per tonne. The operating cost of $13.33 per tonne leaves an operating profit of $14.41 per tonne.

The lower grade, lower recovery, and higher operating costs of the BFS largely account for why the economics of the PFS were not realised. I don't think this has anything to do with the inferred resource.

8
Dec 26, 2012 06:06PM
5
Dec 26, 2012 06:11PM
1
Dec 26, 2012 06:13PM
3
Dec 26, 2012 06:22PM
14
Dec 26, 2012 06:34PM
7
Dec 26, 2012 06:44PM
9
Dec 26, 2012 06:46PM
18
Dec 26, 2012 07:30PM
6
Dec 26, 2012 07:35PM
20
Dec 26, 2012 07:43PM
9
Dec 26, 2012 07:58PM
1
Dec 26, 2012 08:01PM
6
Dec 26, 2012 08:42PM
14
Dec 26, 2012 08:49PM
Share
New Message
Please login to post a reply