It's that time of year for our update. I think they owe us an update and a drilling plan. They should also be announcing what the results are from the field work in Az even if it's just preliminary info. There's plenty to talk about during the quiet time.
Remember this from Feb 11.09
"The Company is pleased with the results from the drilling within the Liard (Main) and Paramount Zones. In the Liard (Main) Zone, drill hole 08CF341 tested an area of the designed pit previously considered to be waste material and extended mineralization eastwards by at least 150 metres. This hole was stopped at a drill-capacity depth of 542.39 metres in mineralization. Drill hole 08CF347 intersected 459.0 metres of mineralization with a copper equivalent grade of 0.50% CuEq and included a 35.05 metre interval that assayed 0.693% copper, 0.022% molybdenum, 0.892 g/t gold and 3.35 g/t silver from 4.05 metres. In the Paramount Zone, the historical higher grades reported by Hecla and Teck and the continuity of mineralization have been confirmed. The results from these diamond drill holes considerably expand the potential size of what already is a world class mineral deposit", says Guillermo Salazar, President and CEO of Copper Fox Metals.
Where's our update guys? We're getting restless. You don't want us filling the void!