Welcome To the Copper Fox Metals Inc. HUB On AGORACOM

CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)

Free
Message: Boards Opinion On Timelines And Catalysts

Apologies, I might have gotten a bit carried away with the notion that some $400m could be spent that quick. First, we spent $85.34 million to December 31, 2012 per the last NR. 4 X's that figure puts a 75% earn-in at $341.36M. None of this has to do with the 4 yr build clause that got thrown out the window, just the time to spend the amount required to assert the 75% earn-in stake.

Check out figure 22.1 in the FS on page 22-3. It shows the cummulative expenditures crossing ~$341M between years (3) and (2) before production and about 3.5 yrs after initiating the project. I like the high, rising Net Cash Flow towards the end of the mine life in that chart prior to the 21st yr (shutdown expenses).

Share
New Message
Please login to post a reply