"Just to further show my point, see the image below. The entire area in purple must be mined but has not even been drilled beyond the near surface (drill holes 397 and 400 failed). That means it's being treated as waste but in reality could be mineralized due to the chargeability in that area. Someone please correct me if I'm wrong, but it appears that a huge amount of material in our pit was never even drilled. Huge fail on Copper Fox's part but also a huge opportunity for improvement."
The area in purple is not part of the feasibility study which means it's not treated as waste.
The ONLY waste rock mentioned in the feasibility study is shown in the area in blue.