"Now the thing of this is......how many would Elmer need to look at them and tell right away which ones "do not" need to go to the lab."
Diamond Drilling Program:
MMTS has recommended a minimum 5,000m (approximately seven holes) diamond drilling program for the Van Dyke copper deposit to confirm the historical drilling results. The program consists of twinning seven historical drill holes, re-submitting pulps from original drill core samples and splitting the mineralized core interval for certain historical drill holes to confirm the historical analytical results (see table below). Based on the results of this sampling, MMTS plans to use the new data to verify the accuracy of the historical information and then complete a NI 43-101 compliant resource estimation for the Van Dyke copper deposit.
|
|
|
|
|
|
|
DDH ID |
From (m) |
To (m) |
Interval (m) |
Total Cu % |
Oxide Cu% |
Sulfide Cu% |
OXY-2 |
402.64 |
419.10 |
16.46 |
0.422 |
0.345 |
0.077 |
OXY-2 |
463.30 |
494.69 |
31.39 |
0.923 |
0.472 |
0.451 |
OXY-6 |
376.12 |
582.17 |
206.05 |
0.574 |
0.481 |
0.093 |
OXY-8 |
313.94 |
442.26 |
128.32 |
0.634 |
0.301 |
0.333 |
OXY-15 |
405.69 |
451.41 |
45.72 |
0.605 |
0.550 |
0.055 |
OXY-17B |
336.19 |
396.85 |
60.66 |
0.772 |
0.480 |
0.292 |
OXY-27 |
524.26 |
661.42 |
137.16 |
0.329 |
0.271 |
0.058 |
VD-6 |
364.54 |
500.48 |
135.84 |
0.330 |
0.273 |
0.057
|
Pulp/Split Sampling:
A total of 406 of the original pulp samples from DDH OXY-6, OXY-8, OXY-15 and VD-6 have been submitted to ALS Chemex to determine the total copper, soluble copper, gold, silver and molybdenum concentration.
Sixty-seven (67) splits of the remaining core from DDH OXY-27 have been collected by Desert Fox and submitted to ALS Chemex to determine total copper, soluble copper, gold, silver and molybdenum concentrations.
Sampling Procedures:
Sample preparation is being conducted by ALS Minerals located in Reno, Nevada and analyses will be completed by ALS Minerals in Vancouver, British Columbia.
http://www.newswire.ca/en/story/1287001/copper-fox-outlines-2014-diamond-drilling-plans-for-van-dyke-copper-project?relation=org