Welcome To the Copper Fox Metals Inc. HUB On AGORACOM

CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)

Free
Message: NTL Status

RED CHRIS CONSTRUCTION UPDATE

Construction by BC Hydro of the 287kv Northwest Transmission Line (NTL) from Skeena substation to Bob Quinn continues, with the targeted completion date now the end of June 2014, a month later than the end of May 2014, as previously scheduled. Construction by the Company of the 93 kilometre Iskut extension of the NTL from Bob Quinn to Tatogga is now expected to be completed by the end of July 2014, also one month later than the end of June 2014, as previously scheduled.

http://www.imperialmetals.com/s/News_2014.asp?ReportID=653443

From Imperial Metals, they said NTL would be finished by end of June as the targeted completion date.

Share
New Message
Please login to post a reply