The original plan was for 5000 meters with a total of 9 drill holes (twin 7 drill holes and two exploration holes)
March 12, 2014
Van Dyke Copper Project
During the quarter, the Company initiated a program to verify the historical results from the Van Dyke oxide copper deposit that consists of a 5,000m (approximately nine holes) diamond drilling program to twin seven historical drill holes, as well as submitting pulps from original drill core samples and splitting the mineralized core interval for certain historical drill holes. Results of the analytical work is expected shortly.
July 21, 2014
Highlights:
Six diamond drill holes (3,211.7m) were completed across the Van Dyke oxide copper deposit,
Broad intervals of copper oxide and copper carbonate minerals were intersected in all holes, The copper mineralization is hosted in intrusive breccia, Pinal schist and granite porphyry,
Two of the drill holes intersected weak quartz veinlet hosted chalcopyrite+/-molybdenite mineralization below the oxide copper mineralization,