What are these holes you speak of? I thought VD was essentially a two-hole project where you sluice stuff down one hole and pull the copper out of the other? I'm not paying that much attention to it so maybe I've gotten it wrong.
=================
From the Jan 9, 2014 NR:
Diamond Drilling Program:
MMTS has recommended a minimum 5,000m (approximately seven holes) diamond drilling program for the Van Dyke copper deposit to confirm the historical drilling results. The program consists of twinning seven historical drill holes, re-submitting pulps from original drill core samples and splitting the mineralized core interval for certain historical drill holes to confirm the historical analytical results (see table below). Based on the results of this sampling, MMTS plans to use the new data to verify the accuracy of the historical information and then complete a NI 43-101 compliant resource estimation for the Van Dyke copper deposit.
Contingent on the results of the initial drilling program, a follow-up 25 hole drilling program has been proposed for the Van Dyke copper deposit.
=================
Im sure it was in a presentation too, but haven't found it yet...