Welcome To the Copper Fox Metals Inc. HUB On AGORACOM

CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)

Free
Message: TSX.V

I feel your wrong. Teck needs to be ready for the next peak in metal prices, and it will take 4 years to build the mine. If they wait for metals to go back up higher before building the schaft creek mine than they are in a risk of producing when metals could fall back down in price. Right now we are in the best time to start building a mine and committing to Schaft Creek. And 4 years later when they produce and sell the metals, prices of metals should be then much higher from today. Teck has plenty of money and they dont look worried.

Share
New Message
Please login to post a reply