"...resource modeling is expected to be completed by end of March 2017."
Oh come on now, YM. Longs have been down that road before. The words "is expected" in a Copper Fox release can join the word "soon" in the list of banned words.
Dec 14, 2010
A Feasibility Study on a minimum 120,000 tpd open pit mine is expected to be completed in early 2011.
Feb 15, 2011
A Feasibility Study on a minimum 120,000 tpd open pit mine is expected to be completed by the end of June 2011.
June 29, 2011
The feasibility study is being led by Wardrop, A Tetra Tech Company on a minimum 120,000 tpd open pit mine and is expected to be completed during the fourth quarter 2011.
Dec 12, 2011
The feasibility study is being led by Tetra Tech WEI Inc. on a minimum 120,000 tpd open pit mine and is expected to be completed during the first quarter of 2012.
March 19, 2012
The feasibility study is being led by Tetra Tech Wardrop on a minimum 120,000 tpd open pit mine and is expected to be completed by mid-summer of 2012.
May 24, 2012
The feasibility study is being led by Tetra Tech Wardrop on a minimum 120,000 tpd open pit mine and is expected to be completed mid-late summer, 2012.
Aug 2, 2012
The feasibility study is being led by Tetra Tech Wardrop on a minimum 120,000 tpd open pit mine and is expected to be completed by late summer, 2012.
Sept 4, 2012
The results of the feasibility study for the Schaft Creek project is expected to be delivered in September 2012.
Sept 25, 2012
The feasibility study is being led by Tetra Tech Wardrop on a minimum 120,000 tpd open pit mine.