Welcome To the Copper Fox Metals Inc. HUB On AGORACOM

CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)

Free
Message: Re: Copper
7
Jun 05, 2018 11:51AM
2
Jun 05, 2018 12:34PM
5
Jun 05, 2018 12:45PM
1
Jun 05, 2018 02:25PM
1
Jun 05, 2018 03:32PM
3
Jun 05, 2018 06:08PM

Willy, this was published a long time ago. the projected time to build the road, which requires two minor and one major bridge, is 15 mo.

The time required to build the mine was 3 years.

I'm sure some of this could be done concurently, and shorten the time, by using heavy lift helicopters. there's also been some talk of starting with a smaller mine which would affect the timeline..chunky

4
Jun 06, 2018 08:30AM
1
Jun 06, 2018 12:19PM
5
Jun 06, 2018 04:07PM
11
Jun 06, 2018 10:36PM
1
Jun 07, 2018 09:35AM
7
Jun 07, 2018 10:04AM
3
Jun 07, 2018 12:07PM
3
Jun 07, 2018 01:14PM
1
Jun 08, 2018 07:31AM
1
Jun 08, 2018 11:54AM
2
Jun 08, 2018 06:19PM
1
Jun 08, 2018 08:07PM
Share
New Message
Please login to post a reply