Welcome To the Copper Fox Metals Inc. HUB On AGORACOM

CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)

Free
Message: Copper

Thanks for providing the link. So, assuming the next cycle from bottom to top of the curve lasts the same as the previous - five years approx - where are we in the cycle and how long does it take for a mine to be built to take advantage of the high price from the get-go? Anyone with more mining knowledge than me - which probably means pretty much everyone here - please feel free to opine.

Share
New Message
Please login to post a reply