Welcome To the Copper Fox Metals Inc. HUB On AGORACOM

CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)

Free
Message: Teck- Project Satellite

Wow! Schaft Creek was not even mentioned, yet 4 of the 5 projects were discussed. Only Schaft Creek left out. Thoughts on why? Could be a good sign......

Project Satellite

The objective of the Project Satellite initiative is to surface value from five substantial base metals assets: Zafranal, San Nicolás, Galore Creek, Mesaba and Schaft Creek, all of which are located in stable jurisdictions in the Americas.

At the Zafranal copper-gold project in southern Peru, the project team significantly advanced its activities in support of a feasibility study, which we expect to complete in the first half of 2019. We expect to submit the social and environmental impact assessment (SEIA) in the second quarter of 2019, which is approximately two quarters later than originally planned as a result of the requirement to complete detailed pre-reviews with the regulator prior to submission. Spending in 2018 was $29.4 million and planned spending in 2019 is $39.7 million.

At the San Nicolás copper-zinc-silver-gold project in Zacatecas, Mexico, a significant drill program was completed, which included infill, geotechnical, hydrogeological, exploration and condemnation drill holes. In addition, the project team advanced social and environmental baseline studies, community engagement activities, preliminary hydrogeological studies and project engineering programs in support of a prefeasibility study (PFS) and early permitting activities. We expect the PFS to be complete in the fourth quarter of 2019. Spending in 2018 was $18.2 million and planned spending in 2019 is $25.6 million.

At the Galore Creek copper-gold-silver project in British Columbia, a 50/50 joint venture with Newmont Mining, program work focused on maintaining the mineral properties and carrying out preliminary geological mapping, prospecting and mineral deposit studies. Spending in 2018 was $4.6 million and planned spending in 2019 is $19.2 million (50% share).

At the Mesaba copper-nickel-platinum group metals-cobalt deposit in northeastern Minnesota, the project team completed a range of planning activities, preliminary development and environmental studies and mineral resource estimate work. Spending in 2018 was $6.4 million and planned spending in 2019 is $13.5 million. 

Share
New Message
Please login to post a reply