For once, in a Teck presentation, Schaft Creek isn't at the bottom or buried. Its last, to be sure, but it happens to be placed at the far right so that it appears to have "the most" of something, lol.
I'm honestly not sure how to take too much quantitatively from this slide..I think the 2.2Mt are the total deposit for the 3 properties...no? There is also the size of the grey rectangles for each deposit that may mean something...
While I would love to see a reveal of something in a Teck deck, and I regularly look for such things, nothing here jumped out at me. Happy to be corrected if I missed something.
The bigger thing for me was an actual timeline given for Schaft....albeit vague. But timelines can be modified....
K