So Q3 is July to September.
initial data is so good they can't announce those numbers yet so they want to wait for the finals to be sure lol. Must be in the mid to high 90s to not share preliminary data that is encouraging and will "optimize the processing flowsheet"!
Geotech data seems positive too-
"As background to the 2023 Geotechnical Investigation, a feasibility-level geotechnical assessment completed in 2013 concluded that the final pit walls would be mainly developed in relatively competent rock with overall slope angles of 40° being considered feasible within the northwest, northeast, east, and southeast design sectors for slope heights ranging from 570 to 1,370 m and overall slope angles of 44° considered feasible within the southwest and west design sectors for slope heights ranging from 380 to 400 m. Recent studies reported in the 2021 PEA on optimization of the project shifted the location of the proposed open pit to the west. The 2023 geotechnical program was completed to support the progression of the geotechnical model for an updated open pit design. The results from the 2023 program indicate that the deposit can be subdivided into 5 separate geotechnical domains, each with recommended pit slope angles, ranging from 39° - 51° and indicating potential for 30 m high benches in the southwestern portions of the pit. Additional drilling is required to confirm the geotechnical design within specific geotechnical domains. These recommendations have been incorporated into the 2024 field program"