"Results of the lock cycle testing is expected to better inform potential changes to the proposed milling flow sheet set out in the 2021 Schaft Creek PEA with potential implications to the mill design, capital expenditures and throughput."
Didn't Elmer drop previous insinuations that anticipated studies might positively impact, amoungst other things, "throughput". Is "throughput" not just code for "size of mining operations"?
With this NR Teck did allow Elmer to publicly state that potentially big changes are in fact being reviewed.
Corrections welcome if I am misinterpreting the term throughput.