Message: May need a long extension cord from Canada

don, the chinese are actually helping replace some major turbines (at the guri dam i believe) and i posted the below message a few days ago...everything the vens are doing points toward a development of LC/LB imo (from the creation of a govt gold assay office to the changes in bcv law to the caura plan, etc.)...i'm not saying "it's a done deal" or that kry is even going to be involved (i've seen way too much BS to be optimistic) but it does appear that they are working toward a large increase in gold production in the area...and are doing it in typical bananahead fashion..

does anyone remember the discussions about powering LC/LB?

posted on Sep 18, 10 08:14AM Use the IP Check tool [?]

The morning of Sunday will be interruption of the service
CORPOELEC installs powerful

transforming in the Pebble

(It presses CORPOLEC- CADAFE 17.09.10). Powerful transforming install the National Electrical Corporation (CORPOELEC) in the substation the Pebble, to fortify and to increase substantially their firm capacity of load of electrical energy and to optimize the quality and trustworthiness of the electrical service in the populations of the municipalities Roscio, Callao and Sifontes of the state Bolivar. During the operations electrical interruptions in the zone will be programmed.
Announcement did it Operations center of DistribuciĆ³n (COD) of CADAFE Region 8, where it explains that this company and EDELCA, CORPOELEC branchs, with the support of the Interior de Bolivar and the Mayorship of the Pebble, this Sunday of eight in the morning to twelve of the noon, kV of 36 MVA of power in the substation will install 115/13,8 a movable transformer of the Pebble, that will replace two 115/13,8 transforming of kV of 10 MVA of power, each. During this operation there will be a programmed interruption of the electrical service in the communities of the municipalities Roscio, Callao and Sifontes.
In this substation, recently a movable transformer of 115/34,5 settled kV of 36 MVA of power that replaced a transformer of 115/34,5 kV of 20 MVA of power, that is put under revision. On the other hand, the Interior de Bolivar and the Mayorship of the Pebble adapted and surrounded the land, where the CORPOELEC technicians will install Sunday the movable transformer of power and, later, will install 115/13,8 a new transformer of kV of 36 MVA of power, that is in the place.
CORPOELEC executes these operations, of joint way and within the framework of the Working Control, that will allow to increase, it enters 20 36 MVA, the capacity signs installed of electricity load to balance the system and to free the provision towards the Tumeremo population, in order to generate a greater well-being socioeconomic and to improve the quality of life of ample residential, commercial and industrial sectors of Guasipati, the Pebble, Tumeremo, the Gilded one and of the rest of the populations of the municipalities Roscio, Callao and Sifontes.