Should be on our property or entering our property soon.........also should be down around the thrust fault if exists on the extreme west side of the property(management thinks it has continuity from the last drill hole).
I'm not looking at this as a one and done scenario......sure will be disappointing if they don't hit the yellow stuff if and when we get below the expected t-fault but still have the east side of the property where the balmer starts at a much shallower depth(thus, the t-fault, if there, would start at a shallower depth).
Should be an interesting 7 to 10 day period coming up unless we see some kind of drilling setback.............GLTA