posted on
Apr 21, 2010 02:34PM
Red Lake wedge Drill hole BR09-02-1 is at 2005 metres this morning having successfully drilled passed wedge.
The azimuth is 84.7 degrees and the dip is 73.0 degrees. Will continue with 5 foot core barrel to see if hole continues to flatten and pull left before putting another wedge to deflect up.
The goal of this 1st w...edge hole is to re-enter the footwall of the NS Shear at approx. 100 metres higher and also have the new hole end approx. 100 metres further to the north from the mother hole