Could be not enough coffee. Happens to me all the time.
Yes, there are two 11 metre sections to come. A bit strange they would leave these out. Don't know if it means anything. 11 metres could be a fairly sizable hit and there are two. Some of this sell-off is likely due to a perceived hiatus in news flow as they suspend drilling while they do EM, downhole and modelling. Those 11 metre sections could throw a monkey wrench into the perceived hiatus.
15,000 metres of drilling for infill and confirmation of historical results to be done. I hope they target Noront's Lost Gold. That should get the SP moving. Also, that 650 metre anomaly looks pretty interesting as does the fact that they've already found gold and pyrite in that direction. I think the presence of pyrite should make this anomaly easy to find. They couldn't drill the main part of the anomaly because of poor ice conditions. I wonder if they will be drilling this over the summer. BTW 15,000 metres is quite a bit of drilling.
There has been no drilling yet from underground and that is one of the reasons they put in the ramp.
The words bulk mining and open pit have a nice ring to them.
I too would be interested in anything Hoov had to say about EAG. But I don't think he has made even one post on this forum; so maybe he is not following it.
Just rambling as usual. JMHO.