Welcome to the Electrovaya Hub on AGORACOM

(Edit this message through the "fast facts" section)

Free
Message: 25 energy storage units have been installed on the LV network in Bracknell.
If unit performs as expected should have a PR in coming weeks. http://www.thamesvalleyvision.co.uk/?wpdmdl=1753 SSEPD confirms that this criterion has been met through the installation and connection of 25 Energy Storage and Management Units (ESMUs) on the LV network around Bracknell. This document provides details of the completion of the installation and connection of 25 ESMUs, and presents the findings identified in line with the evidence criteria specified for the Successful Delivery Reward Criteria (SDRC). It is confirmed that:  25 energy storage units have been installed on the LV network in Bracknell.  Photographs of all installed ESMUs have been taken and are provided in this report.
Share
New Message
Please login to post a reply