NR - initial Horne 5 drilling results
posted on
Jul 07, 2015 01:34PM
a 100% interest in 74,000 hectares of land in the historic Rouyn-Noranda Mining Camp
Falco Announces Initial Horne 5 Drilling Results1:26PM ET on Monday Jul 06, 2015 by Marketwire
Falco Resources (TSX VENTURE: FPC) ("Falco") is pleased to announce the first results of its current confirmation drilling program on the Company's 100% owned Horne 5 project. The program consists of 18 holes totaling 16,000 meters. To date 6 holes have been completed, logged, analyzed and assayed. Four additional holes are in progress with results pending.
Luc Lessard, President and CEO, commented: "We are very comfortable with the initial confirmation drilling on the upper portion of the Horne 5 Deposit, and the project is progressing well. Falco intends to continue to execute on its confirmation drilling program, and is working towards its goal of moving the Horne, which was once Quebec's largest underground mine, back to producer status."
HIGHLIGHTS FROM CONFIRMATION DRILLING PROGRAM
The 2015 confirmation drilling program has four main objectives: i) verification of the historical data to upgrade the current Inferred resources to the Indicated category; ii) to test the silver grades which were not assayed historically; iii) the collection of material for metallurgical testing and iv) the compilation of data for the rock mechanic studies.
As noted above, analytical results have been received for the first 6 holes drilled at Horne 5. Results received to date can be summarized as follows:
-- Pilot holes: 3 pilot holes have been completed for a total of 3,949 meters. All of the holes have intercepted the targeted mineralized zones. All holes have been logged and mineralized intercepts were sent to the lab for assay.
-- Wedge holes: 3 wedges have been completed to date for a total of 1,572 meters. All of the holes have intercepted the targeted mineralized zones. All holes have been logged and mineralized intercepts were sent to the lab for assay. Additionally, portions of each wedge were sent to SGS Canada for metallurgical testing.
Assay results have been received for six holes (H5-15-01, H5-15-02, H5-15-03B, H5-15-01Atw, H5-15-02Atw, H5-15-03Dtw) of the planned 18-hole drill program.
Comparisons of these results with the nearest historical data are shown in the following tables. The comparisons are made on all assays for the entire length of the mineralized zone without applying a cut-off grade. The lengths presented are core length. Given the historical drill holes are not parallel to the 2015 drill holes, cylinders of 15m around the 2015 drill holes were used to select the historical samples in the immediate vicinity of the drill hole for the basis of comparison. Note that the historical data did not include any silver values.
The initial results from the first 3 pilot holes and their respective wedges during the 2015 drill program confirm the grades of the historical drill holes.
Comparison of New Drill Hole Data vs. Historical Raw Assay Data --------------------------------------------------------------- --------------------------------------------- New Drill Hole New Drill Hole Historical Raw Data Data Assay Data ---------------------------------------------------------------------------- 2015 Results vs Historical Length Au_Eq_With Au_Eq Without Au_Eq Without Data Hole_ID (m) Silver (g/t) Silver (g/t) Silver (g/t) ---------------------------------------------------------------------------- H5-15-01 31.2 3.00 2.85 2.82 0.9% --------------------------------------------------------------- ------------ H5-15-01-Atw 36.7 1.45 1.38 2.85 (51.5%) ---------------------------------------------------------------------------- H5-15-02 100.9 2.93 2.48 1.92 29.4% ---------------------------------------------------------------------------- H5-15-02-Atw 87.0 2.82 2.39 2.16 10.6% ---------------------------------------------------------------------------- H5-15-03B 116.7 1.34 1.11 1.23 (9.7%) ---------------------------------------------------------------------------- H5-15-03Dtw 134.4 1.46 1.23 1.28 (3.7%) ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- Total 506.9 2.05 1.76 1.76 0.4% ----------------------------------------------------------------------------
Breakdown of Confirmation Drilling Results at $0 NSR ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ($0 NSR) 2015 Diamond Drill Hole Results ---------------------------------------------------------------------------- Au_Eq_ Au_Eq_ With Without From To Length Au Ag Cu Zn Silver Silver Hole_ID (m) (m) (m) (g/t) (g/t) (%) (%) (g/t) (g/t) ---------------------------------------------------------------------------- H5-15-01 1,110 1,141 31.2 2.03 10.16 0.46 0.04 3.00 2.85 ---------------------------------------------------------------------------- H5-15-01-Atw 1,105 1,142 36.7 0.88 4.51 0.27 0.06 1.45 1.38 ---------------------------------------------------------------------------- H5-15-02 1,001 1,102 100.9 1.32 29.46 0.11 1.94 2.93 2.48 ---------------------------------------------------------------------------- H5-15-02-Atw 1,002 1,089 87.0 1.43 28.61 0.13 1.47 2.82 2.39 ---------------------------------------------------------------------------- H5-15-03B 1,248 1,365 116.7 0.50 15.51 0.06 1.00 1.34 1.11 ---------------------------------------------------------------------------- H5-15-03Dtw 1,255 1,390 134.4 0.55 15.44 0.08 1.10 1.46 1.23 ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- Total 506.9 0.96 19.39 0.13 1.17 2.05 1.76 ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- Grade % Difference ---------------------------------------------------------------------------- --------------------------------------------------------------- Weighted Average of 2014 Raw Assays within a 15 m radius cylinder around DDH --------------------------------------------------------------- Au_Eq_ Without 2015 vs Au Cu Zn Silver 2014 (g/t) (%) (%) (g/t) % --------------------------------------------------------------- 2.26 0.30 0.10 2.82 0.9% --------------------------------------------------------------- 2.18 0.35 0.12 2.85 (51.5%) --------------------------------------------------------------- 1.14 0.11 1.19 1.92 29.4% --------------------------------------------------------------- 1.25 0.12 1.41 2.16 10.6% --------------------------------------------------------------- 0.79 0.06 0.67 1.23 (9.7%) --------------------------------------------------------------- 0.82 0.06 0.70 1.28 (3.7%) --------------------------------------------------------------- --------------------------------------------------------------- 1.14 0.12 0.83 1.76 0.4% --------------------------------------------------------------- --------------------------------------------------- (15.6%) 8.8% 39.8% 0.4% ---------------------------------------------------
The new drilling is verifying the geometry of mineralized zones previously defined by the historic work by Noranda and compares favorably in terms of grade. Drill holes H5-15-02 and H5-15-03 tested a silver and zinc-rich portion of the deposit