Good morning Lanman and all !
Talking about Sekkutas 2 - I have sent you a few pictures.....(3)
The first one shows the Szekkutas 1 site.
The wellhead is covered with a shed - I wonder if the wellhead was paintes also like the others.Pictures 2 and 3 show the recent painting job of the toll bar.
The jobs was done after the field was ploughed,because the painter had to move the mould away in order to paint correctly.
There was no way to find out about the pressure.
(I have also a few pictures showing the MAKO 7 site.
I was lucky to find the wellhead uncovered,because the painting crew had to move away the shed.I guess as the work is finished now,MAKO 7 is covered again with the same type of shed like Szekkutas 1 and is having 5000 PSI pressure.
MAKO 7 is also having a pipeline connection.)