Specializing in the strategic acquisition, exploration and development of uranium properties and is headquartered in Kelowna, British Columbia

Free
Message: 2014 winter assay results
August 7, 2014 - 3:00 AM EDT
FCU:CA 1.35 0.10
Today 5d 1m 3m 1y 5y 10y

FCUUF 1.23 0.08
Today 5d 1m 3m 1y 5y 10y

Fission Winter Program; 26.41% U3O8 Over 12.0m (Line 855E); Three New High-Grade Holes

Eastern half of PLS continues high-grade expansion

KELOWNA, BRITISH COLUMBIA--(Marketwired - Aug. 7, 2014) - FISSION URANIUM CORP. ("Fission" or "the Company") (TSX VENTURE:FCU)(OTCQX:FCUUF)(FRANKFURT:2FU) is pleased to announce 2014 winter assay results from six holes drilled on the R780E zone and one hole on the R00E zone at its Patterson Lake South (PLS) property in Saskatchewan's Athabasca Basin, Canada. Of particular note are holes PLS14-201 (line 855E), which returned composited assay intervals including 26.41% U3O8 over 12.0m within an interval of 12.12% U3O8 over 27.0m and PLS14-213 (line 810E), which returned composited assay intervals of 11.37% U3O8 over 11.0m within a larger interval of 4.05% U3O8 over 34.0m.

Ross McElroy, President, COO, and Chief Geologist for Fission, commented,

"The PLS discovery continues to expand in size and potential along strike. Today's results, headlined by holes PLS14-201 and PLS14-213 in the eastern half of the discovery, are an excellent example of the wide, high-grade mineralization that PLS is becoming renowned for."

Assay Highlights

PLS14-201 (Line 855E)

  • 12.0m (128.0m to 140.0m) @ 2.51% U3O8, including:
    • 5.0m (133.0m to 138.0m) @ 5.61% U3O8
  • 27.0m (149.0m to 176.0m) @ 12.12% U3O8, including:
    • 12.0m (163.5m to 175.5m) @ 26.41% U3O8

PLS14-213 (Line 810E)

  • 34.0m (147.5m to 181.5m) @ 4.05% U3O8, including:
    • 11.0m (167.0m to 178.0m) @ 11.37% U3O8

PLS14-205 (Line 900E)

  • 10.0m (229.0m to 239.0m) @ 2.65% U3O8, including:
    • 1.5m (231.5m to 233.0m) @ 11.57% U3O8

More winter assays pending: To date, assay results from 75 holes of the recently completed winter program have now been released; results from 17 holes are pending.

Composited % U3O8 mineralized intervals are summarized in Tables 1 and 2 below. Samples from the drill core are split in half sections on site. Where possible, samples are standardized at 0.5m down-hole intervals. One-half of the split sample is sent to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK for analysis which includes U3O8 (wt %) and fire assay for gold, while the other half remains on site for reference. All analysis include a 63 element ICP-OES, uranium by fluorimetry and boron. All depth measurements reported, including sample and interval widths are down-hole, core interval measurements and true thickness are yet to be determined.

Table 1: R780E Zone

Composited Mineralized Intervals (Down-hole measurements)

Zone Hole ID Grid Line Az Dip From (m) To (m) Interval (m) U3O8 (wt%)
R780E PLS14-201 855E 128.00 140.00 12.00 2.51
133.00 138.00 5.00 5.60
149.00 176.00 27.00 12.12
163.50 175.50 12.00 26.41
189.50 190.50 1.00 0.15
209.00 211.50 2.50 3.80
264.50 265.00 0.50 0.07
272.50 273.00 0.50 0.06
281.50 282.00 0.50 0.12
284.50 285.50 1.00 0.10
289.00 289.50 0.50 0.06
294.00 295.50 1.50 0.11
R780E PLS14-203 705E 103.50 105.00 1.50 0.12
110.00 138.00 28.00 0.28
140.50 141.00 0.50 0.09
143.00 151.50 8.50 0.12
154.50 156.00 1.50 0.42
161.50 166.00 4.50 0.63
179.00 180.50 1.50 0.06
R780E PLS14-205 900E 101.00 102.00 1.00 0.08
114.00 114.50 0.50 0.05
132.50 175.50 43.00 0.54
167.50 175.00 7.50 1.54
179.50 190.00 10.50 0.50
199.00 202.00 3.00 0.05
213.00 213.50 0.50 0.06
219.50 223.00 3.50 0.97
229.00 239.00 10.00 2.65
231.50 233.00 1.50 11.57
241.50 242.50 1.00 0.06
247.50 248.50 1.00 0.14
251.50 287.00 35.50 0.59
296.00 297.00 1.00 0.06
303.50 306.00 2.50 0.15
309.00 309.50 0.50 0.07
314.00 316.00 2.00 0.05
343.00 343.50 0.50 0.06
346.50 347.50 1.00 0.20
R780E PLS14-207 750E 162.50 163.00 0.50 0.09
165.50 169.50 4.00 0.13
172.00 172.50 0.50 0.07
186.50 188.00 1.50 0.11
190.50 199.00 8.50 0.09
248.00 248.50 0.50 0.07
274.50 275.50 1.00 0.10
281.50 283.00 1.50 0.08
286.00 288.50 2.50 0.19
302.00 303.50 1.50 0.12
306.50 307.00 0.50 0.06
309.00 309.50 0.50 0.07
312.00 313.50 1.50 0.12
325.50 326.50 1.00 0.28
348.00 348.50 0.50 0.08
354.00 355.50 1.50 0.10
384.00 384.50 0.50 0.07
R780E PLS14-210 630E 109.00 116.50 7.50 0.07
119.50 120.00 0.50 0.15
132.00 132.50 0.50 0.08
140.50 151.00 10.50 0.09
156.50 157.00 0.50 0.05
159.00 159.50 0.50 0.08
184.50 185.50 1.00 0.16
190.50 191.00 0.50 0.07
205.00 206.00 1.00 0.13
209.00 215.00 6.00 0.45
219.00 222.50 3.50 0.15
226.00 232.00 6.00 0.91
R780E PLS14-213 810E 120.00 126.00 6.00 0.19
147.50 181.50 34.00 4.05
167.00 178.00 11.00 11.37
186.50 187.50 1.00 0.36
198.50 199.50 1.00 0.84
212.00 215.50 3.50 0.07
221.00 221.50 0.50 1.77
230.00 230.50 0.50 0.30
239.00 240.50 1.50 1.48
254.00 254.50 0.50 0.18
259.50 261.00 1.50 0.12
266.00 266.50 0.50 0.06
271.00 272.00 1.00 0.08

Composite Parameters

  1. Minimum Thickness: 0.50m
  2. Grade Cut-Off: 0.05 U3O8 (wt%)
  3. Maximum Internal Dilution: 2.00m

Table 2: R00E Zone

Composited Mineralized Intervals (Down-hole measurements)

Zone Hole ID Grid Line Az Dip From (m) To (m) Interval (m) U3O8 (wt%)
R00E PLS14-204 135E No significant mineralization

Composite Parameters

  1. Minimum Thickness: 0.50m
  2. Grade Cut-Off: 0.05 U3O8 (wt%)
  3. Maximum Internal Dilution: 2.00m

PLS Mineralized Trend Summary

Uranium mineralization at PLS has been traced by core drilling over 2.24km of east-west strike length in five separate mineralized "zones" from line 615W (PLS13-124) to line 1620E (PLS14-196). From west to east, these zones are; R600W, R00E, R780E, R1155E and R1620E. The former R390E, R585 and R945E zones have been merged into the R780E zone by successful winter drilling. Mineralization remains open along strike both to the western and eastern extents. Mineralization is both located within and associated with a metasedimentary lithologic corridor, bounded to the south by the PL-3B basement Electro-Magnetic (EM) Conductor.

Fission has received and released assay results on 75 holes from its winter 2014 drill program at PLS. Updated maps and files can be found on the Company's website at http://fissionuranium.com/project/pls/.

Patterson Lake South Property

The 31,039 hectare PLS project is 100% owned and operated by Fission Uranium Corp. PLS is accessible by road with primary access from all-weather Highway 955, which runs north to the former Cluff Lake mine and passes through the nearby UEX-Areva Shea Creek discoveries located 50km to the north, currently under active exploration and development.

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed on behalf of the company by Ross McElroy, P.Geol. President and COO for Fission Uranium Corp., a qualified person.

About Fission Uranium Corp.

Fission Uranium Corp. is a Canadian based resource company specializing in the strategic exploration and development of the Patterson Lake South uranium property and is headquartered in Kelowna, British Columbia. Common Shares are listed on the TSX Venture Exchange under the symbol "FCU" and trade on the OTCQX marketplace in the U.S. under the symbol "FCUUF."

ON BEHALF OF THE BOARD

Ross McElroy, President and COO

Share
New Message
Please login to post a reply