10 kWp installed power connected to the network Girasolar building integrated PV system (BIPV) system by performing the installation was commissioned. Schneider Electric Co. 's new factory in Manisa Organized Industrial Zone was established at the entrance of the system, 72 to 150 Wp power glass-glass PV module consists of.

Girasolar, special projects in the sector brings its signature sound continues to throw. Company, in the last 10 kWp installed capacity connected to the network building integrated PV system (BIPV) system by performing the installation was commissioned. Schneider Electric Co. 's new factory in Manisa Organized Industrial Zone was established at the entrance of the system, 72 to 150 Wp power glass-glass PV module consists of. Due to the design of the building is integrated into every element of the installation of systems that are specifically designed, but also serves as the entrance door to the roof. The system is placed steel construction, a common result of this study was designed specifically to projects and steel construction in place of assembly, were made in common by design but also the construction of factory buildings that perform all Sipil Inc. were carried out by.

Placed on the assembly of PV modules steel construction system, again with the support of this project being designed specifically to Girasolar all elements of the mounting system specially built. Onsite installation and commissioning performed by the team itself Girasolar system also provides 100% water seal, the "energy-generating roof" concept to suit the structure's roof to see the task as well as producing energy. Projects related to making a statement that Girasolar team, "Every time again as the sector in a special place which has a different form and implement projects to continue. Install this system the necessary size of both functions, several specific points as of hosts. This project is used in all elements, specifically designed to be built. For example, there were clear expression, spatial approximately 15% of light transmission PV modules were used. construction of the modules are mounted to the mounting system, aluminum profiles and the module to the project specifically designed and built. In addition, the system has been installed completely watertight to be designed. So the roof to see the task as well as forming the roof thanks to PV module electrical energy produces. I mean building a complete integrated PV system (BIPV). Such projects become widespread "self-generating energy from home" concept, according to the numbers we think will rise. " as said.

http://www.gunesdergisi.com/web/haber_goster.asp?id=2071