Sketch,
As soon as I read your post, I realized there was an error in my silver equivalent numbers. I mistakenly took the monthly revenues and divided by the silver price to get equiv silver production. The problem with this is the revenue is about 20% less than the metal value because of the smelter fees. The short of it is that the 1500 tpd mill should produce 4.18 million ounces silver equivalent per year. Thanks,
-Argoz