Welcome To The Goldrush Resources HUB On AGORACOM

Since early 2006, Goldrush Resources has successfully explored for gold in Burkina Faso and has over $3 million in the treasury, 2 Net Smelter Returns Royalty and 6 strategically located exploration permits.

Free
Message: Goldrush Announces Exploration Program for Newly Acquired Burkina Faso Permits




ccnm


VANCOUVER, BRITISH COLUMBIA--(Marketwire - Feb. 15, 2011) - Goldrush Resources Ltd. (TSX VENTURE:GOD) (the "Company") is pleased to announce its planned exploration program for its three newly acquired permits in Burkina Faso, West Africa [see Goldrush news release 2011-2, February 2, 2011].
The adjacent Nakiambouri [225 km2] and Gonaba-Est [80 km2] permits are located in south-eastern Burkina Faso, approximately 55 kilometers south of the town of Fada N'Gourma. The Gonaba-Est permit is contiguous with the north boundary of the Mt. Isa Metals Limited Yactibo Project that hosts a new gold discovery approximately 25 kilometres to the south. A recent press release [January 20, 2011] from Mt. Isa provided the information that 20 of 21 widely spaced, shallow Reverse Circulation ("RC") holes over the entire 3,500 metre length of exposed artisanal workings had an average lode intersection of 5.66g Au/t gold over 4.6 metres. Significant high grade intersections reported include 14.01g Au/t over 8 metres, 10.11g Au/t over 8 metres, 24.62g Au/t over 6 metres and 13.88g Au/t over 4 metres.
These intersections are reported to occur within a granodiorite host rock, possibly similar to the granitoid-related gold occurrences of the substantial Ahafo and Chirano Mines in Ghana's Sefwi Belt to the south. Initial exploration by Goldrush on its Gonaba-Est and Nakiambouri permits has mapped abundant granodiorite and associated quartz veining, and on one of the Nakiambouri artisanal sites visible gold was identified in quartz veining in the granodiorite host rocks.
The Goldrush permits host a number of active, long-term artisanal mining sites including the two kilometre long "Hong Kong" site which was worked by over 100 orpailleurs since 2002 and the "PK-60" site where 200 gold workers are currently active, both on the Gonaba-Est permit.

1Readers are cautioned that gold mineralization that occurs on Mt. Isa's permits may not extend onto the Company's permits, and that the foregoing information on the Nabanga Permit is as provided by the Mt. Isa Metals Limited January 20, 2011 press release.
The similarity of the geological environment of the Nakiambouri and Gonaba-Est permits to the Mt Isa discovery and other gold occurrences in West Africa have led Goldrush's exploration team to prioritize exploration on these two permits. A program of detailed mapping and rock sampling, followed by ground geophysics, including magnetometer and gradient array induced polarization/resistivity surveys is to be initiated immediately, with RC drilling to follow as soon as possible thereafter.
The 180 km2 Liki permit is located in north central Burkina Faso along the Bouroum-Yalgo Greenstone Belt that hosts the Taparko Gold Mine of High River Gold Mines Ltd. (located approximately 80 kilometers to the southwest) and the Inata Gold Mine of Avocet Mining PLC (located approximately 55 kilometers to the northwest). On the Liki permit, artisanal miners are extracting gold from surface eluvium and from quartz veins hosted by granitic rocks, mafic volcanics and volcanosediments over a strike length of at least 400 metres. From 60 rock grab samples taken from the main gold workings, 13 samples (21%) returned anomalous to significant gold mineralization to a maximum of 19.15 g Au/t.
Goldrush will begin a 1,000 metre reverse circulation drill program at the main Liki artisanal site as part of the 5,000 metre drill program scheduled to begin the third week of February on targets located on the Kongoussi 1 and Tikare permits, which together host the 249,000 ounce inferred gold resource [5.9 million tonnes at a grade of 1.31 g Au/t] at the Company's Ronguen Deposit.

Quality Assurance and Quality Control



Goldrush maintains a rigorous quality control program involving the use of certified standards from an accredited Canadian laboratory, the insertion of blanks, and the use of repeat assaying. The details of Goldrush's quality control program were provided in the Company's News Releases #2010-13, dated October 25, 2010 and #2011-2, dated February 2, 2011.


Mr. Driffield Cameron, P. Geo., Director of Goldrush, is the Qualified Person for this press release for the purposes of National Instrument 43-101 and has reviewed the technical information herein.
For further information on Goldrush Resources Ltd., shareholders and other interested parties are invited to visit the Company's website at




FOR FURTHER INFORMATION PLEASE CONTACT: Don Willoughby
Goldrush Resources Ltd.
VP Corporate Development
604-602-9973
604-681-5910 (FAX)
info@goldrushresources.ca
>www.equicomgroup.com

Share
New Message
Please login to post a reply