Note where this is coming from?
Drill holes L1-102 to L1-104 were drill from the same set up. The nickel mineralization in hole L108-102 from 134.00 to 136.27 metres is located approximately 13.5 metres east of known underground development. The intersection of massive sulphides from 143.69 to 144.49 metres is located approximately 16.5 metres down dip from the 315 foot mine level. The high-grade nickel mineralization of 1.808% Ni over 2.52 metres (true width) from 172.16 to 175.20 metres is located 35.2 metres below the 315 foot mine level and is 8.7 metres down dip from previously released drill hole L107-41, which returned 0.399% Ni over 1.28 metres (true width).
Drill holes L108-103 and L108-104 intersected anomalous and lower-grade nickel mineralization below the southerly plunging West Zone.
Drill hole L108-105 was designed to intersect the West Zone below the 315 foot mine level. The high-grade nickel mineralization of 3.454% Ni over 2.69 metres (true width) is approximately 24 metres up dip from previously released drill hole L107-60.
Drill hole L108-106 was planned to intersect the West Zone approximately 40 metres down dip of the 315 foot level. The high-grade nickel mineralization of 1.652% Ni over 5.66 metres containing 3.053% Ni over 2.66 metres (true widths) was intersected approximately 32.5 metres down dip from the 315 foot mine level.