Welcome To The Inspiration Mining HUB On AGORACOM

The company is exploring for nickel deposits on its Langmuir property near Timmins, Ontario; for nickel-gold-copper on its Cleaver and Douglas properties; and for molybdenum and rare earth elements at recently acquired Desrosiers property.

Free
Message: More holes today for ISM...

Hi Stones I was thinking the same thing as they had traded nearly one million shares in the fist 70 minutes of trading. LT is $1.50 and they are up 27% today on 1,566,000 shares



As for ISM, just more of the same :) Those dang truth machines are so boring............Maybe we need a "conductive body" shot to get this puppy moving

......Drill results proving up the resource.....LOL (that's tongue in cheek folks) In-fill

Inspiration Intersects 1.390% Ni Over 7.61m or 24.97ft and 1.179%Ni Over 14.03m or 46.03ft (True Width) (ccnm)
4 Holes reported
L108 (107-110)

Inspiration is continuing the drilling at the Langmuir Project - Langmuir No.1 Mine. The detail fill-in drill program is designed to complete the definition of the nickel bearing mineralization below the 300-foot mine level to a vertical depth of approximately 900 feet below surface.



Drill holes L108-107 and L108-108 were completed from the same setup located north of the underground development. Hole L108-107 failed to intersect the nickel mineralization due to the presence of a large felsic intrusive dyke.

Drill hole L108-108 intersected a new mineralized zone approximately 16.5 metre below surface returning 1.149% Ni over 2.07 metres (true width). The high-grade nickel mineralization of 2.591% Ni over 3.15 metres and containing 6.687% Ni over 0.82 metres (true width) is approximately 12 metres down dip from previously released drill hole L107-51 and approximately 22.7 metres up dip from previously released drill hole L106-16.

Drill hole L108-109 intersected the East Zone approximately 26.8 metres down dip from previously released drill hole L106-19 and approximately 18.5 metres up dip from previously released drill hole L107-33.

Drill hole L108-110 intersected high-grade nickel mineralization of 1.179% Ni over 14.03 metres or 46.03 feet (true width) approximately 16.4 metres and 30.0 metres down dip from previously released drill hole L105-1 and the 315 foot mine level, respectively.



Share
New Message
Please login to post a reply