Welcome To The Inspiration Mining HUB On AGORACOM

The company is exploring for nickel deposits on its Langmuir property near Timmins, Ontario; for nickel-gold-copper on its Cleaver and Douglas properties; and for molybdenum and rare earth elements at recently acquired Desrosiers property.

Free
Message: INSPIRATION INTERSECTS 0.674% NI OVER 24.44M OR 80.18FT CONTAINING 1.091% NI OVE

INSPIRATION INTERSECTS 0.674% NI OVER 24.44M OR 80.18FT CONTAINING 1.091% NI OVE

posted on Jan 08, 2009 06:57AM

Inspiration Mining Corporation

Suite 1800, 130 King Street West, Toronto, Ontario M5X 1E3

PRESS RELEASE

Inspiration Intersects 0.674% Ni over 24.44m or 80.18ft containing 1.091% Ni over 7.98m or 26.18ft (True Width)

FOR IMMEDIATE RELEASE

January 8, 2009 TSX - ISM

Frankfurt- OI8

Toronto, Ontario - Inspiration Mining Corporation (the “Corporation”) is pleased to announce the results of the continuation of their diamond drilling program on its Langmuir Project, located in Langmuir Township south of Timmins, Ontario. The Langmuir Property consists of 69 unpatented contiguous mining claim units covering approximately 1090 hectares in the north-central portion of Langmuir Township, Porcupine Mining Division, and District of Cochrane, Ontario. The property is approximately 25 km southeast of Timmins, Ontario, and hosts the past producing Langmuir No.1 Mine, and majority of the past producing Langmuir No. 2 Mine.

Inspiration is continuing the drilling at the Langmuir Project – Langmuir No.2 Mine – North Zone. The detail fill-in drill program is designed to complete the definition of the nickel bearing mineralization. Several drill holes were terminated in nickel bearing mineralization and these drill holes have been extended.

The following table indicates the drill information for the North Zone drill holes:

Drill Hole

Grid Northing (metres)

Grid Easting (metres)

Dip

Azimuth (Geodetic)

Section Northing (metres)

Section Easting (metres)

Length (m)

LN08-124

3230.83

2001.64

-59.16

297.73

3798.80

118.06

199.82

LN08-125

3230.65

2002.02

-71.71

299.15

3798.83

118.47

203.45

LN08-126

3219.83

1970.06

-50.35

300.95

3773.49

96.21

169.89

Drill holes LN08-124 and LN08-125 were completed on Section 3800 North and below previously released drill holes LN06-30 and LN06-31 to follow up the down dip extension of higher grade nickel mineralization.

The intersections in LN08-124 range approximately from 97.55m to 115.12m vertically below surface while the intersections in LN08-125 ranges approximately from 155.02m to 174.53m. The intersection in LN08-125 is approximately 57.65m down dip from LN08-124.

Drill hole LN08-126 was completed on Section 3775 North to fill in a gap between previously released drill holes LN06-63 and LN05-10, which are stratigraphically approximately 10m above and 29m below LN08-126, respectively.

The above drill holes continue to confirm the presence of a higher-grade nickel bearing mineralization within the northern portion of the Langmuir No.2 North Zone.

The following revised assay results for drill holes LN08-124 to LN08-126, inclusively at the Langmuir No.2 Mine – North Zone have been received, compiled and condensed to the following:

Drill Hole

From (m)

To (m)

Core Length (m)

True Width (m)

Core Length (ft)

True Width (ft)

Weighted Average Ni (%)

LN08-124

115.20

154.00

38.80

28.38

127.30

93.11

0.462

and contains

116.30

125.56

9.26

6.77

30.38

22.21

0.872

119.05

122.70

3.65

2.67

11.98

8.76

1.004

123.53

125.56

2.03

1.48

6.66

4.86

1.146

129.70

137.08

7.38

5.40

24.21

17.72

0.720

132.27

134.33

2.06

1.51

6.76

4.95

0.972

146.83

152.03

5.20

3.80

17.06

12.47

0.439

LN08-125

138.80

193.85

55.05

29.98

180.61

98.36

0.390

and contains

161.29

184.84

23.55

12.83

77.26

42.09

0.634

or

170.33

182.36

12.03

6.55

39.47

21.49

0.944

with

170.33

171.82

1.49

0.81

4.89

2.66

2.222

and

174.72

177.38

2.66

1.45

8.73

4.76

1.382

LN08-126

69.43

98.57

29.14

24.44

95.60

80.18

0.674

and contains

69.68

74.40

4.72

3.91

15.49

12.83

0.513

78.10

94.69

16.59

13.91

54.43

45.64

0.869

with

85.17

94.69

9.52

7.98

31.23

26.18

1.091

or

85.17

89.40

4.23

3.55

13.88

11.65

1.366

or

85.17

86.15

0.98

0.82

3.22

2.69

2.455

and

101.88

112.50

10.62

8.91

34.84

29.23

0.328

101.88

106.23

4.35

3.65

14.27

11.98

0.424

and

119.00

123.45

4.45

3.73

14.60

12.24

0.596

122.75

123.45

0.70

0.58

2.30

1.90

1.940

The nickel bearing sulphide mineralization, with estimations ranging from 1% to 20% fine-grained disseminatations up to massive 100% sulphides, is contained within serpentenized komatiitic ultramaftic extrusive flows with occasional spinifex texture.

The assaying technique used is the industry standard for base metal assaying, which uses nitric and hydrochloric acids that extracts nickel only from sulphide mineralization and not from nickel silicate minerals.

The assaying of split core samples was conducted by Swastika Laboratories, and included the insertion of

blanks and standards. The Qualified Person in charge of the Langmuir Project and the person who prepared the

technical data in this release is Kian Jensen, B.Sc., P.Geo. (On), who is an arm's length party retained by the

Company to carry out its exploration program on the Langmuir Project.

For further information, please contact Randy Miller, President of the Company, at tel: 905.853.7400, www.inspirationmining.com

For Investor Relations call:

Gale Capital Corporation

Ph. 604.221.7604

Fax 604.221.7606

galecapital@shaw.ca

The TSX has not reviewed and does not accept

responsibility for the adequacy or accuracy of this release.

Share
New Message
Please login to post a reply