IMHO everyone is showing a lot more anxiety than is warranted. Mid December is not that far away guys & gals. Consider the know facts about Langmuir 1 & 2N, 350+ drill cores, good showings in most cores, ore body(s) are open at depth & length, previously economic and profitable mines, technical 43-101. I could go on but I think you get the picture.
I for one am very happy ISM chose to delay the resource calculation pending analysis of the additional delineation drilling of the L2 north zone. They are clearly & correctly reacting to the exploration feed back and not getting into a big rush. They don’t have to.
On another note. I have noticed for a long time, the bid volumes are skillfully tailored to almost always appear lower than the ask volume. It makes me think someone has been accumulating for quite some time. Thoughts anyone?
EBF