Actively exploring for base and precious metals in the Reed Lake District of Manitoba and for diamonds in the Canadian Arctic.

The mission is to fund the exploration and development of their key projects to enhance shareholder value.

Free
Message: VMS NEWS - JULY 3, 2008 10.36% Copper over 33.46M!!!!!!!!!

VMS NEWS - JULY 3, 2008 10.36% Copper over 33.46M!!!!!!!!!

posted on Jul 03, 2008 06:34AM

VMS REPORTS 10.36% COPPER OVER 33.46 METRES IN DEEPEST INTERCEPT TO DATE AT REED LAKE, MANITOBA

July 3, 2008

Vancouver, B.C., July 3, 2008. VMS Ventures Inc. (TSX.V: VMS) (the “Company”) is pleased to report on its ongoing exploration program at the Reed Lake Discovery Zone near Snow Lake, Manitoba.

Reed Lake Drill Hole Highlights:

  • RD-08-38 Intersects 35.81 metres (117.49ft) of 2.22% Copper

Including 12.10 metres (39.70ft) of 2.92% Copper

  • RD-08-39 Intersects 13.88 metres (45.54ft) of 3.56% Copper

Including 4.10 metres (13.45ft) of 7.67% Copper

  • RD-08-41 Intersects 33.46 metres (109.78ft) of 10.36% Copper

Including 18.08 metres (56.04ft) of 13.03% Copper

Including 5.00 metres (16.40ft) of 16.30% Copper

Dr. George Gale, VP Exploration comments, “The results from drill hole RD-08-41 indicate that there are very high-grade copper sections to this deposit. It is also noteworthy that this is the deepest intersection of mineralization to date at approximately 350 m from surface. The high-grade copper zones may represent a copper-rich footwall zone that is stratigraphically below the solid sulphide lens. This intersection is one of several high-grade copper zones intersected to date that require more detailed drilling to determine true thickness.”

Short copper-zinc mineralized intervals are present in RD-08-25, RD-08-40 and RD-08-42, which represent areas of shearing that displaced most of the mineralized section. Similar displaced sections exist in other drill holes, such as RD-08-15.

Drill holes RD-08-42 (see Table 1 below) to 47 and RD-08-49 intersected both altered footwall and hanging wall rocks but no significant intervals of sulphide. These holes and a detailed logging of previous drill holes have increased our understanding and modeling of the deposit. Hole RD-08-42 entered a near vertical shear above the targeted depth and deviated away from the target.

Holes RD-08-48 and RD-08-50 were positioned to test copper rich intersections of mineralization to the southwest in hole RD-08-38. Hole RD-08-50 intersected 15 metres of Near Solid Sulphide (NSS), which extends the NSS lens to the SW. Drill hole RD-08-48 intersected extensive, weakly altered footwall rocks but did not reach the target depth.

Drilling continues at the Discovery Zone and at the Tower Zone and results will be released as received.

TABLE ONE

REED LAKE DRILL HOLES*

HOLE ID

FROM

(m)

TO

(m)

INTERVAL*

(m)

COPPER

(%)

ZINC

(%)

SILVER

(g/t)

GOLD

(g/t)

RD-08-38

229.65

266.44

35.81

2.22

0.06

Pending

Pending

including

244.55

256.61

12.10

2.92

0.08

Pending

Pending

RD-08-39

189.58

203.46

13.88

3.56

0.49

Pending

Pending

including

196.32

200.42

4.10

7.67

1.84

Pending

Pending

RD-08-41

332.14

365.60

33.46

10.36

0.11

Pending

Pending

including

346.92

365.00

18.08

13.80

0.15

Pending

Pending

including

355.00

360.00

5.00

16.30

0.14

Pending

Pending

RD-08-25

124.55

127.38

2.83

0.85

5.14

Pending

Pending

RD-08-40

286.11

286.81

0.70

1.78

1.48

Pending

Pending

RD-08-42

473.61

474.06

0.45

0.82

0.04

Pending

Pending

*True Thickness Unknown

All technical information in this release was reviewed by Dr. George Gale, P.Eng the Qualified Person for VMS Ventures Inc. Samples are prepared and analyzed at Activation Laboratories, Ancaster, Ontario using acid digest assay analytical methods.

VMS Ventures Inc. is focused primarily on acquiring, exploring and developing copper-zinc properties in the Flin Flon Snow Lake VMS Belt. The Company also holds the largest land package considered prospective for nickel-copper mineralization at Lynn Lake, which is to date Canada’s third largest nickel producing camp. The Company’s project portfolio consists of the Snow Lake VMS project, the Lynn Lake Gabbros nickel-copper project, the Nickel Belt project, the South Bay nickel-copper-cobalt PGE property, and the Eden Lake Carbonatite Complex a specialty metals property. All VMS Ventures Inc. properties are located in the mining friendly province of Manitoba, Canada.


ON BEHALF OF THE BOARD OF DIRECTORS

John Roozendaal, B.Sc.

President, Director


For further information contact:

Keith Patey,

Director of Communications
Telephone: (604) 986-2020
Toll Free: 1-866-816-0118

Dale Paruk

Coal Harbor Communications
Telephone: (604) 662-4505
Toll Free: 1-877-345-3399

Share
New Message
Please login to post a reply