Re: And this bytch is responsible for our pain!
in response to
by
posted on
Oct 23, 2023 09:25AM
Your math works out. They currently have $276 mln on the balance sheet, plus $330 from GM T2 equals $606 mln. $1 bln from the DOE loan plus $750 mln from the shelf financing, plus the $606 comes out to $2.356 bln, and their CAPEX for Phase 1 is $2.3 bln.