Welcome To The MPH Ventures HUB On AGORACOM

Edit this title from the Fast Facts Section

Free
Message: MPH VENTURES - UPDATE
1
Jun 23, 2008 07:11AM

Jun 28, 2008 02:08PM
2
Jul 14, 2008 09:15AM

Jul 17, 2008 12:14PM
MPH Ventures Drills 23 Metres of .38% Mo & 29 Metres of .18% Mo Near Surface at Pidgeon Molybdenum Deposit in NW Ontario
09:00 EST Monday, Sep 29, 2008


VANCOUVER, BRITISH COLUMBIA--(Marketwire - Sept. 29, 2008) - MPH Ventures Corp. (TSX VENTURE:MPS)(FRANKFURT:IJA1) (the "Company") is pleased to provide assay results on the completion of the company's 2008 phase 2 drill program on its 100% owned Pidgeon Molybdenum Deposit project located at the east end of Lateral Lake, Echo Township, northwestern Ontario.

Pidgeon Molybdenum Deposit location map: http://www.mphventurescorp.com/s/Ima...

MPH Ventures completed a 31 hole drill program on its Phase 2 program for 2008. Assays have now been received for all holes drilled in this program. The drill program consists of a series of step out drill holes that was designed to intersect Molybdenum mineralization within 100 metres of surface.

The goal of this drill program was to achieve 20 million tonnes with an average grade of 0.10% Mo of a drill indicated resource. The Company believes it has surpassed this goal and the data acquired will now be submitted for an updated independent resource evaluation to NI 43-101 standards.

The drilling indicates that the size of the molybdenum deposit has been substantially increased. The drilling also indicates that the known molybdenum zone is open along several trends to the west and suggests that significant new tonnage can also be developed in this direction. The stripping and drilling carried out in 2008 by MPH Ventures indicate that significant new tonnage could also be added along the footwall on the mineralized body along its entire length (approx. 1700 metres), as this area has never been adequately drilled.

MPH Ventures is assimilating all new drill information and mapping into its data base, and is making preparations for a winter 2008-2009 drill program. Significant additional drilling is planned to expand and fully define the deposit.

PHASE 2 DRILL HOLE SUMMARY

-----------------------------------------------------------------
Hole No. From (m) To (m) Core Length (m) % Mo
-----------------------------------------------------------------
PM8-1 49.3 m 54.3 m 5.0 m 0.601 Mo
-----------------------------------------------------------------
PM8-2 71.5 m 87.0 m 16.5 m 0.027 Mo
-----------------------------------------------------------------
incl 71.5 m 80.8 m 9.3 m 0.308 Mo
-----------------------------------------------------------------
PM8-3 44.2 m 68.6 m 24.4 m 0.043 Mo
-----------------------------------------------------------------
PM8-4 26.5 m 34.2 m 7.7 m 0.510 Mo
-----------------------------------------------------------------
PM8-5 47.9 m 73.8 m 25.9 m 0.075 Mo
-----------------------------------------------------------------
PM8-6 40.2 m 63.8 m 23.6 m 0.101 Mo
-----------------------------------------------------------------
PM8-7 41.7 m 75.3 m 33.6 m 0.108 Mo
-----------------------------------------------------------------
PM8-8 38.9 m 69.3 m 30.4 m 0.091 Mo
-----------------------------------------------------------------
PMB-9 34.7 m 47.9 m 13.2 m 0.172 Mo
-----------------------------------------------------------------
PM8-10 No significant values
-----------------------------------------------------------------
PM8-11 No significant values
-----------------------------------------------------------------
PM8-12 No significant values
-----------------------------------------------------------------
PM8-13 19.2 m 29.2 m 10.0 m 0.055 Mo
-----------------------------------------------------------------
PM8-14 31.7 m 60.7 m 29.0 m 0.178 Mo
-----------------------------------------------------------------
PM8-15 46.2 m 75.2 m 29.0 m 0.069 Mo
-----------------------------------------------------------------
PM8-16 59.1 m 77.1 m 18.0 m 0.078 Mo
-----------------------------------------------------------------
PM8-17 45.8 m 66.8 m 21.0 m 0.067 Mo
-----------------------------------------------------------------
PM8-18 32.6 m 56.0 m 23.4 m 0.377 Mo
-----------------------------------------------------------------
PM8-19 39.8 m 68.1 m 28.3 m 0.163 Mo
-----------------------------------------------------------------
PM8-20 12.8 m 31.4 m 18.6 m 0.157 Mo
-----------------------------------------------------------------
PM8-21 60.0 m 61.0 m 1.0 m 0.150 Mo
-----------------------------------------------------------------
PM8-22 No significant values
-----------------------------------------------------------------
PM8-23 No significant values
-----------------------------------------------------------------
PM8-24 No significant values
-----------------------------------------------------------------
PM8-25 15.4 m 37.0 m 22.6 m 0.051 Mo
-----------------------------------------------------------------
PM8-26 34.6 m 53.9 m 19.3 m 0.073 Mo
-----------------------------------------------------------------
PM8-27 46.8 m 73.6 m 27.0 m 0.019 Mo
-----------------------------------------------------------------
PM8-28 No significant values
-----------------------------------------------------------------
PM8-29 No significant values
-----------------------------------------------------------------
PM8-30 No significant values
-----------------------------------------------------------------
PM8-31 No significant values
-----------------------------------------------------------------

Drilling continues to confirm the Company's opinion that a potential open pit situation exists on the Pidgeon Molybdenum property. The Pidgeon Molybdenum Deposit property has excellent infrastructure with an all weather road going across the property, location to a paved highway is only 10 km to the south, and location to the major Trans Canada CN rail line is only 10 km to the north of the property.

As a summary, MPH Ventures has now completed 2 phases of diamond drilling on the Pidgeon Molybdenum Deposit project. The Company also had a resource estimate completed by Wardrop Engineering in 2007. (see Wardrop Engineering report filed on SEDAR November 27, 2007)

The Wardrop Report recommended a drill program to confirm the location, continuity, grade and geometry of the molybdenum deposit as outlined by Rio Algom in 1981 (11,477 metres drilled in total).

MPH Ventures successfully carried out a 16 hole Phase 1 drill program (3,061 metres) to meet and confirm the Wardrop criteria in reporting a molybdenum deposit on the Pidgeon Molybdenum Deposit property. (see news release March 26 2008)

The Company completed an additional 31 hole Phase 2 drill program (2,462 metres) on the Pidgeon Molybdenum Deposit project from May to July 2008. The objective was to significantly increase the tonnage (size) of the known molybdenum deposit.

In addition to the drilling, an area of 30 metres by 40 metres was stripped of overburden and mapped in detail by MPH Ventures geologist. The Company will also be carrying out a bulk sample from the stripped area to obtain a better estimate of the likely grade of the deposit. This size of area would produce 2,430 tonnes per vertical metre. Channel sampling of the proposed bulk sample area is now being undertaken.

The partial exposure of the deposit and detailed mapping has resulted in a significant new interpretation of the mineralization and suggests strongly that the grade of this deposit could be significantly greater than indicated by surface drilling due to a strong nugget effect in the molybdenum zone.

GEOLOGY OF THE PIDGEON MOLYBDENUM DEPOSIT

The Pidgeon Molybdenum deposit consists of molybdenum mineralization that occurs in a zone of vein filled hydro fracturing in compositionally banded granite. Major veins are 1 to 2 metres wide and trend at 110 degrees. A second set of veinlets 10 to 20 cm wide trends at 70 degrees. Intense alteration extends 1 to 2 metres out from the larger veins that trend at 110 degrees. This same alteration extends 30 to 40 cm out from the veinlets that trend at 70 degrees.

Molybdenite occurs in all vein and veinlets as well as in the intensely altered rock. The molybdenite is nuggety within the alteration and extremely nuggety within the quartz veins, particularly within the larger veins. It is this nuggety nature that suggests that the grade may be significantly under estimated from drill hole results. Large clots of molybdenite observed within the quartz veins were seldom, if ever, observed in drill core. There is no association with any other elements. This would suggest simple mill circuitry and a clean concentrate.

The mineralization has a known continuous strike length of 1700 metres with an average true width of 25 metres. The mineralization has a relatively shallow dip to the southeast and occurs from surface to depths below 200 metres. The geometry of the deposit is highly amenable to open pit extraction mining with a very low stripping ratio.

At the Pidgeon Molybdenum Deposit property, drill core is sawn into halves, with one-half being sent for analysis and the other kept for future reference. All samples were prepared and analyzed at TSL Laboratories in Saskatoon using a four acid digestion method. A stringent program of quality control is employed throughout the exploration program with standards, duplications and blanks being entered into the sample stream at 30 sample intervals.

David J. Busch, B.A., B.Sc., PGeo., MPH Ventures' Project Manager, is the qualified person under the meaning of National Instrument 43-101 and has reviewed the data in this News Release.

MPH Ventures Corp. is a molybdenum and precious metal exploration company focused on mineral development within Canada.

For further information on MPH Ventures Corp. (TSX VENTURE:MPS) visit the Company's web site at www.mphventurescorp.com.

ON BEHALF OF THE BOARD OF DIRECTORS

Jim Pettit, President

This news release contains certain "Forward-Looking Statements" within the meaning of Section 21E of the United States Securities Exchange Act of 1934, as amended. All statements, other than statements of historical fact, included herein are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations are disclosed in the Company's documents filed from time to time with the British Columbia Securities Commission and the United States Securities & Exchange Commission.

FOR FURTHER INFORMATION PLEASE CONTACT:

MPH Ventures Corp.
James G. Pettit
President
(604) 687-3376 or Toll Free: 1-800-567-8181
(604) 687-3119 (FAX)


or

MPH Ventures Corp.
Don Myers
Director
(604) 687-3376 or Toll Free: 1-800-567-8181
(604) 687-3119 (FAX)
Email: info@mphventurescorp.com
Website: www.mphventurescorp.com

Oct 07, 2008 07:49AM

Nov 11, 2008 05:32AM
Share
New Message
Please login to post a reply